Fast demoulding, no curing and maximum productivity
THE SECTOR
Precast elements
Cement International Technologies’ ultra-rapid cements are ideal for the precast industry: they accelerate production, make it possible to avoid curing and improve the profitability of each mould.
HOW WE SOLVE IT
Solutions for precast elements
01
Advantages
→Fast demoulding and the option to avoid curing.
→Increased productivity, continuity and homogeneity in production.
→Cost optimisation and mitigation of delay-related risks.
→Faster works to meet deadlines and avoid penalties.
02
Hybrid towers
Cement International Technologies is developing, together with GESTAMP HYBRID TOWERS, an optimisation programme for the international development of its hybrid towers.
03
Precast foundations
The elements for the foundation of the solar panels at the KOC Photovoltaic Plant in Kuwait were produced entirely by iCONKRETE in Spain with Ultraval cement, increasing production and installation rates.
04
Cut & Cover tunnels
The world’s fastest manufacture of elements for the “cut and cover” method. Workability of over 4 hours, demoulding in under 8 hours even in cold conditions, the option to eliminate steam curing and a low water/cement ratio that ensures quality and durability.
05
Segments for tunnel boring machines (TBM)
Ultraval and Ultraval SR are the fastest cements for producing segments for tunnel placement by TBM, with complete production reliability even in cold conditions, the best technical solution at the most competitive price and significant savings in the process.
Shall we talk about your next project?
Personalised technical advice, in any country in the world.
We use our own and third-party cookies for technical purposes and, with your consent, to improve your experience. You can accept them, reject them or find out more in our Cookie policy.